Compliance Audit Program – MRDCL

Date:

2020

Client:

Independent Electricity System Operator (IESO)

Solar and wind suppliers of electricity that participate in the Feed-in Tariff (“FIT”) Program must adhere to prescribed minimum domestic content requirements as per their FIT Contract, referred to as the Minimum Required Domestic Content Level (“MRDCL”).

Midgard Consulting Incorporated (“Midgard”) was retained by the Independent Electricity System Operator of Ontario (“IESO”) to audit the MRDCL compliance of a total of 88 operating solar and wind facilities under the FIT Program.

The solar facilitates varied in sizes between 20kW to 10MW and the wind facilities varied between 10MW to 230MW.