What is interconnection?

Why is interconnection important?

Who is responsible for interconnection?

What is the typical interconnection process?

What is an Interconnection Agreement?

What is a Point of Interconnection and why is it a critical aspect of the grid interconnection process?

How is Power System Simulation for Engineers (PSS/E) software utilized in planning and analyzing electrical networks?

What is the BC Hydro Competitive Electricity Acquisition Process (CEAP) 2024 Call for Power?

What is an Integrated Resource Plan (IRP) and how does it guide long-term energy planning for utilities?

What are the capabilities of Power Systems Computer-Aided Design (PSCAD) software in modeling and simulating power systems?

What is a System Impact Study (SIS) and how does it assess the effects of new interconnections on the existing grid?

My site won't be exporting power to the grid. Why do I need a study?

How are interconnection costs typically allocated between the project owner and the utility?

How much does an interconnection project cost?